Will the amphitheatre be built?
The planned theatre (to be located between blocks F and G) has been scrapped, and a theatre stage is to be located on the beach
Will the marina be built?
The Egyptian Government in an effort to protect the virgin coral reefs around the Zafarana area has decided to not issue licenses for the mooring of ships on this section of coastline. We will be constructing a long jetty to the first reef. The exact construction choice will be made referring to the licenses, which will be provided. From this jetty it is possible to enter the first reef directly when going into the water. The diving school will also run water sport activities from this point.
Where will the planned swimming pool between blocks F and H be built?
The swimming pool will be placed between blocks E and I.
Can my apartment be designated as no smoking?
It is possible to rent the apartment smoking free. This will also mean that the owners won’t be allowed to smoke within the apartment.
How is the quality of the complex that is being constructed?
Construction is according to the South European standards. Engineers who are employed by IPI, and our Dutch employees in Egypt constantly check the construction and the materials. IPI has also introduced European building techniques to Egypt. Examples of this are the cement vibrators to optimize the foundation and pillars and the sealing of the sanitary areas according to Dutch standards.
What facilities have been cancelled from the original vision / plan of the resort?
Salt water pool, crazy golf (incomplete list)
What is the cost of transfers to Zafarana?
How many restaurants will there be at the resort?
There will be seven restaurants, namely a Spanish, French and Lebanese restaurant in the hotel building; an Indian, Italian and a buffet restaurant with a variety of menus in the building which will be situated in the carousel. The seventh restaurant will be a grill restaurant situated on the beach
What provision will there be for making chilled drinking water available throughout the resort?
What will be the cost of final inspection if conducted by an independent consultant?
Hotel suite (1 bedroom) 275,00; Hotel suite (2 bedrooms) 325,00; Garden apartment 325,00; Middle apartment 325,00; Penthouse 350,00
What proof of ownership will I receive on completion?
After completion, IPI will obtain proof of ownership through the court in Cairo. This is the only official document to prove ownership. It is strongly recommend that this document is stored in a safe place
Will the swimming pools be heated?
In the unlikely event the thermoshield does not perform, what plans do IPI have to keep the units cool in summer and warm in winter?
Thursday, 23 October 2008
FAQ
Labels:
faq (ongoing)
Subscribe to:
Post Comments (Atom)
I think we need a lengthy explanation as to whats happening with Thermoshield as IPI seem to be telling some people its not reqiured and others that it will devalue there property if they do not have it?
ReplyDeleteWe also need to know the procedure for obtaining a full refund as this development is no longer what we have purchased we should have the option to a refund if required.
Can we be sure that the Thermoshield (the real one that NASA uses) is put on to our appartments? In the Dutch newsletter it's suddenly called: the heath- and soundabsorbing elastic material. Before it was just called Thermoshield. Also the newsletter says that the buildingprocess will be done by South European standards, before it were European standards
ReplyDeletewe also would like to underscribe the letter. We are Soulje, app. C.6.3
ReplyDelete